Connecting a generator to your house: the cost and what €400 covers

Komplektas MVD6000 6 kW trifazis dyzelinis generatorius su ATS

At Hybrid Energy, connecting and starting up a generator costs from €400. This covers choosing the
backup power layout, connecting the generator, starting it up and checking how the system works when the
power goes off. The generator, the ATS (automatic transfer switch), cables, protective devices and work on
the distribution board are priced in a quote before any work starts. The connection itself usually takes
no more than one working day.

Key points

  • Connection and start-up cost from €400: choosing the layout, connecting the generator, starting it up
    and testing it with the power off.
  • The generator, the ATS (if it is not part of the kit), cables, protective devices and materials are
    priced separately. In kits sold “with ATS”, the ATS is already included in the price.
  • Rework of the distribution board, a base for the generator, groundwork, a longer cable, unloading and
    noise reduction add to the total, but not every house needs them. You see all of this in the quote before
    the work starts.
  • ESO, Lithuania’s electricity distribution operator, recommends connecting a generator to the house
    wiring only through a fixed connection and leaving the job to qualified specialists. A fixed connection is
    not a plug in a wall socket.
  • Delivery time depends on the generator model; the connection itself usually takes no more than one
    working day. The quote is valid for 10 working days.

What the €400 generator connection covers

For the connection price from €400, Hybrid Energy does four things: chooses the backup power layout,
connects the generator, starts it up and checks how the system works when the power goes off.

The layout decides which circuits in the house will run from the generator and how the house is switched
from the grid to the generator: with a manual changeover switch or with an ATS. The electrician connects and
starts the generator according to this layout. The last step is a test: we check that the selected circuits
get power when the grid supply is cut. If an ATS is installed, the automatic switchover is tested as well.
After the test you are shown how to use the system.

The price is given as “from” because the final total depends on the house: what the distribution board
is like, how far from it the generator will stand and whether the cable has to be laid underground. Hybrid
Energy estimates the cable length and the board preparation from your description and a photo of your
distribution board.

What is priced in the quote

Priced separately are the generator itself, the ATS if it is not part of the kit, cables, protective
devices and materials, as well as work that not every house needs. The table shows where each part is
counted and what its cost depends on.

Part of the work or equipment Where it is counted What the cost depends on
Choosing the layout, connection, start-up, test with the power off Connection price from €400 Final total given in the quote
Generator Separately, at the model price Power, number of phases, fuel, starting method
ATS Already in the price of kits “with ATS”, otherwise separately Whether an ATS is already part of the kit
Manual changeover switch In the quote Chosen layout and distribution board
Cable In the quote Distance from the generator’s position to the board
Protective devices and additional materials In the quote Chosen layout
Distribution board rework In a separate quote The existing board and space for new devices
Base for the generator, groundwork In a separate quote Whether the generator stands outdoors and whether the cable has to go underground
Unloading In the quote Generator size and access
Noise reduction In the quote Noise level of the model and distance to living areas
Integration with Deye, Solis and a battery Calculated case by case Inverter and generator models, layout

The cable length depends on where the generator will stand. The requirements for its position are set
out in the generator’s manual, so read the manual before you choose the spot. The further the generator is
from the board, the longer the cable, and if the cable crosses the garden, groundwork may be needed as
well.

Noise varies a lot between models. According to the manufacturer’s data on the Hybrid Energy product
pages, the Marsun MVB6PI produces 68 dB, the Marsun MVD6 72 dB and the Marsun MVD6000-ATS kit 97 dB
(measurement conditions not stated). If the generator will stand next to a bedroom window or a neighbour’s
plot, raise this while you are still choosing the model, because noise reduction is priced separately.

The quote lists equipment, labour, materials, delivery and the final total as separate lines. The offer
is valid for 10 working days and the prices are final. Delivery within Lithuania is free.

ATS or manual changeover switch: which to choose

A manual changeover switch suits you if you are at home during power cuts and can start the generator
yourself. An ATS is needed when the house has to switch over without you, for example if you are often away
or the heating must not stop. When the power goes off, the ATS starts the generator by itself and switches
the supply over, and when grid power returns it switches back.

Automatic backup needs a generator with electric start, because the ATS starts it without anyone present.
Models started by hand, such as the Marsun MVB3.5PI, are used with a manual changeover switch.

The price difference works like this. In kits “with ATS” the ATS is already included, so on top of the
kit price you add only the connection from €400 and materials as quoted. Hybrid Energy also sells an ATS
for 6–15 kW generators separately
(ATS 6–15 kW (199 €)),
and an ATS for 20 kW generators
(ATS 20 kW (269 €)).
For the Marsun MVD12 and MVD15, the external ATS module is bought separately. The price of a manual
changeover switch is given in the quote.

How much generator power you need and when to choose a three-phase model is not covered here: see the
article
Home generator: power, ATS and
three-phase models
.

How to connect a generator to a house, and why not through a socket

ESO recommends connecting a generator to the house wiring only through a fixed connection, with measures
that prevent the generator’s voltage from reaching the ESO grid. In our view, a plug in a wall socket is
not such a connection. ESO’s recommendations on installing a backup power source say:

„Elektros generatorių jungti su visos patalpos vidaus elektros tinklu galima tik įsirengiant
stacionarią jungtį ir priemones, kurios užtikrina, jog generatoriaus generuojama įtampa nebūtų
perduota į ESO elektros tinklus, dėl ko kiltų didelė rizika žmonių gyvybei ir sveikatai, ar būtų
sugadinti jūsų prietaisai, generatorius ar padaryta kita žala. Šį darbą patikėkite atlikti tik
kvalifikuotiems specialistams.“

[A generator may be connected to the internal wiring of the whole premises only by installing a fixed
connection and measures that ensure the voltage produced by the generator is not fed into ESO’s
electricity networks, which would create a serious risk to human life and health, or could damage your
appliances or the generator, or cause other harm. Leave this work only to qualified specialists.]

ESO: Rekomendacijos rezervinio šaltinio įsirengimui (Recommendations for installing a backup power source)

In Hybrid Energy’s layouts the house is connected to the generator through a manual changeover switch or
an ATS, and the work is done by a certified electrician. Which switch to use and where in the board to
connect the generator is set out in the layout, which you agree before the work starts.

How the job is done

There are five steps from enquiry to test. The connection itself usually takes no more than one working
day, sometimes less.

  1. Enquiry with a photo of the board. Using the form or by phone, you tell us which
    appliances need power and where the generator will stand. If you can, attach a photo of your distribution
    board: it is used to estimate the cable length and the board preparation.
  2. Quote. The generator and layout are chosen. The quote lists equipment, labour,
    materials, delivery and the final total separately. It is valid for 10 working days.
  3. Delivery. The generator and materials are delivered free of charge anywhere in
    Lithuania. Delivery time depends on the generator model.
  4. Connection and start-up. A certified electrician connects the generator according to
    the agreed layout and starts it up.
  5. Test with the power off. We check how the system works when the power goes off, and
    with an ATS the automatic switchover is tested too. You are shown how to use the system.

Three common set-ups: what the total comes to

The minimum total is the generator price plus the connection from €400. On top of that come the parts of
the quote that depend on your house: the switch, cables, protective devices and other work.

Basic backup. The
Marsun MVB6PI
generator, 1 469 € (5.5 kW, single-phase, petrol), or the
Marsun MVD6,
1 969 € (5.5 kW, three-phase, diesel), plus the connection from €400, plus a manual
changeover switch and cables as quoted. When the power goes off you start the generator yourself, and only
the selected essential circuits get power, for example the boiler pump, the fridge, the lighting and the
water pump.

Automatic backup with ATS. The
Marsun MVB6000-ATS
kit, 1 749 € (6 kW, three-phase, petrol), or the
Marsun MVD6000-ATS,
2 249 € (6 kW, three-phase, diesel), plus the connection from €400, plus cables,
protective devices and materials as quoted. The ATS is already in the kit price. If the house has a heat
pump, its starting current is checked. More on this in the article
Generator for a boiler and heat pump.

Generator with a hybrid inverter. A hybrid inverter is the device that solar panels and
a battery are connected to. It uses the battery first and switches the generator on when the battery is not
enough. The
Marsun MVB7
generator, 1 469 € (6.5 kW, three-phase, petrol), has a Two-Wire Start connection: a
two-wire start input through which a hybrid inverter can start the generator. Price: the generator, plus
the connection from €400, plus integration with Deye, Solis and a battery, calculated case by case. How a
generator and a solar system work together is described in the article
Generator and solar system.

Set-up Model Power (rated / max) Phases, fuel Starting Fuel consumption Noise* Generator + connection from (prices 26 Nov 2026) Extra, as quoted
Basic backup Marsun MVB6PI 5.5 / 6 kW Single-phase, petrol Electric, Start/Stop button 453 g/kWh 68 dB €1,469 + €400 = €1,869 Manual changeover switch, cables
Basic backup Marsun MVD6 5.5 / 6 kW Three-phase, diesel Electric 274 g/kWh 72 dB €1,969 + €400 = €2,369 Manual changeover switch, cables
Automatic backup Marsun MVB6000-ATS 6 / 6.5 kW Three-phase, petrol Electric, ATS in the kit 395 g/kWh 70–75 dB €1,749 + €400 = €2,149 Cables, protective devices, materials
Automatic backup Marsun MVD6000-ATS 6 / 6.5 kW Three-phase, diesel Electric, ATS in the kit 295 g/kWh 97 dB €2,249 + €400 = €2,649 Cables, protective devices, materials
With a hybrid inverter Marsun MVB7 6.5 / 7 kW Three-phase, petrol Electric, Two-Wire Start ≤ 374 g/kWh ≤ 97 dB €1,469 + €400 = €1,869 Integration with the inverter and battery (case by case)

* Fuel consumption and noise are the manufacturer’s figures from the Hybrid Energy product pages; noise
measurement conditions are not stated. The totals in the table are calculated at prices of 26 November 2026
and do not include the switch, cables, protective devices or other parts of the quote. The current
generator price is shown in the text above and on the product page.

What you can do yourself

Before sending an enquiry you can gather information so that the quote is ready sooner. Leave the actual
connection of the generator to the house wiring to an electrician, as ESO recommends.

  1. Take a photo of your distribution board so that the circuit breakers and their labels are visible.
  2. Write down what must keep working during a power cut: the boiler, water pump, fridge, lighting, heat
    pump or other appliances.
  3. Choose where you would like the generator to stand and measure the distance to the board. Before that,
    read the section of the generator manual on where to place it.
  4. Decide whether you will always be at home during power cuts. If not, consider a kit with ATS.
  5. If you have or are planning a hybrid inverter, note its make and model.
  6. Send everything through the enquiry form.

What we will do

Hybrid Energy will choose the generator and the backup power layout, send you a quote before the work
(valid for 10 working days) and deliver the generator free of charge anywhere in Lithuania. A certified
electrician will connect the generator, start it up and check how the system works with the power off.
Connection and start-up cost from €400 and usually take no more than one working day. The generator comes
with a 2-year statutory warranty.

Send an enquiry through the form,
email sales@hybridenergy.lt or call
+370 636 52 222 (Mon–Fri 9:00–18:00).

Frequently asked questions

How much does a generator with ATS and installation cost in total?

The petrol Marsun MVB6000-ATS kit (6 kW, three-phase, ATS in the kit) costs
1 749 € and the diesel Marsun MVD6000-ATS costs 2 249 €. Hybrid
Energy adds the connection from €400 to the kit price, so the total starts at €2,149 or €2,649 (prices of
26 November 2026). Cables, protective devices and materials are priced in the quote.

Can a generator be connected to a house through a socket?

No, a wall socket is not a suitable way to connect a generator: ESO’s recommendations on installing a
backup power source say a generator may be connected to the wiring of the whole premises only through a
fixed connection with measures that stop its voltage from reaching the ESO grid, and that the work should
be left to qualified specialists. Hybrid Energy installs such a connection, with a manual changeover switch
or an ATS, using a certified electrician.

Why is the price given as “from €400” and not exactly?

The amount of work differs from house to house: in one the generator stands right next to the board, in
another it needs a longer cable, groundwork, a base or board rework. Hybrid Energy estimates these parts
from your description and a photo of the board, and before the work sends a quote that lists equipment,
labour, materials, delivery and the final total separately.

Do you install generators in Vilnius and other towns?

Yes. Hybrid Energy delivers and connects generators anywhere in Lithuania, in Vilnius, other towns and
rural areas, and delivery is free. Delivery time depends on the generator model. The connection itself
usually takes no more than one working day, sometimes less. You can send an enquiry through the form or by
phone on +370 636 52 222.

Can a generator be connected to a Deye or Solis hybrid inverter?

Often it can, but it depends on the specific inverter, the generator model and the layout. Some Marsun
models, such as the MVB7, have a Two-Wire Start connection through which a hybrid inverter starts the
generator. Hybrid Energy checks compatibility before making an offer, and integration with Deye, Solis and
a battery is calculated case by case.

Sources

  • ESO, “Rekomendacijos rezervinio šaltinio įsirengimui” (Recommendations for installing a backup power
    source): fixed connection, voltage reaching the ESO grid, qualified specialists:
    eso.lt
    (checked 26 November 2026)
  • Hybrid Energy, “Home generator installation”: connection price and what it includes, parts of the
    quote, how the job is done, timing, three set-ups for a house: